We recently completed this project for a local client who needed a refit in their factory.
It included the removal of existing worn out PIR panels and doors, which we then replaced with a new hygienic fire door and two 100mm PIR panels.
We then installed a new hygienic 9mm polyurethane heavy-duty floor topping, including resin cove skirting and joints, to ensure the space is both attractive and safe to work in.
All the works were completed over a long weekend, which meant there was no disruption to the client’s working day, and they were delighted with the results.
[ngg src=”galleries” ids=”9″ display=”basic_thumbnail”]
Pingback: What Services do Octego Provide to Food Factories? - Octego Ltd