Case Studies

We recently completed this project for a local client who needed a refit in their factory.  It included the removal of existing worn out PIR panels and doors, which we then replaced with a new hygienic fire door and two 100mm PIR panels. We then installed a new hygienic 9mm polyurethane heavy-duty floor topping, including […]

We recently completed a cold room installation project at High Weald Dairy, a local dairy in Horsted Keynes that produce award-winning cheeses. Our works involved firstly moving the existing air handling unit, to create space for the new cold room. We then excavated groundworks, installing a new stainless steel drainage system and a new reinforced

We had a request from a client to carry out some refurbishment work.  The project involved first removing all the old metal works, checker plate barriers, old brickworks, and redundant drainage.  We then installed a new drainage system, concrete slab and heavy-duty barriers, before creating new block works to install new heavy-duty metal plates for

A few years ago we helped build and fit-out a new brewery in West Sussex. Burning Sky Brewery Ltd required groundworks and excavation of the existing slab in order to install 3  new stainless steel drainage systems. We installed a new polymer granite reinforced screed laid to falls, with a hygienic polyurethane 9mm floor topping,